A yarny blind date

I’ve signed up for the Sock Knitter’s Pentathlon (for which there are Ravelry and Yahoo groups) because, well, I liked the look of it. The group summary goes:
In honor of the upcoming Summer Olympics in Beijing, a sock knitter’s pentathlon is being organized. This group will test your sock knitting skills. During the course of the year, competitors will knit 5 pairs of socks in 5 different styles.

That means a pair of socks in each two month period starting from 1st March. Having two months to complete a pair of socks feels do-able for me, where other groups that are doing a pair of socks a month, for example, send me into a panic just thinking about it. Two months gives me some breathing space! There is, of course (since this is an ‘Olympic’ event *g*) a competitive element to the Pentathlon – there are points awarded according to how you place in the finished socks stakes. But if you don’t complete a sock in the allotted time, even though you’re then eliminated from the competition element of the group, you can still knit along for the rest of the patterns for the fun of it. Perfect!

However! As I said, the kal / competition begins on 1st March – just over a day away. That’s when the first pattern will be released… all we know so far is that the yarn we will need should knit to 8 sts per inch on 2.5mm (or thereabouts) needles, and that solid or semi-solid yarns will work best. Being on a yarn diet, I’m obviously not buying anything new and I hardly need to with the amount of sock yarn in my stash. But I can’t decide what to use! Heeeeelp! I feel like, because I don’t know what the pattern looks like yet, I can’t choose the yarn / colour that will look best. Maybe I should just wait until the pattern comes out, but then I’ll have to think about which yarn to pick and then rewind it, all of which will be cutting into my knitting time… and I know I wasn’t particularly going to do the competition element of this, but I’d kind of like to see how I can do at it anyway.

I have narrowed my choices down a bit, though, so maybe I could get some opinions? Have a look at the poll below…

Continue reading “A yarny blind date”

Project 365 #3, Days 12-16: 21st – 25th Jan

Still playing catch-up with posting these, here are the next five days of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #3, Days 12-16: 21st – 25th Jan”

SP11 Package #3 – at last!

Due to mania, server crash and my sieve-like memory, I hadn’t posted my final SP11 package squee-ing. So here it is now. I did mention on 3rd December that I’d received it, but that was as far as I got. (In that post I also mentioned that I’d been delayed in sending my final package out to my spoilee. Well, it’s still here – my money situation has meant I haven’t been able to find the postage yet. But it belatedly occurred to me that some virtual gifts were possible, and I’m putting a bit of cash by each week to send the non-virtual things! Also, I said that I had a new design for this site. As you can see, that’s not in place yet either. Hopefully soon, though!)

Anyway! Even though the package arrived at the beginning of December, it was all Christmas themed and wrapped. Hee!

Photo of my SP11 package #3 in the box Photo of my SP11 package #3 pressies
Not that I let that put me off opening everything right then, of course. I did think very briefly about saving it all for Christmas, but… nah. So what was inside all that shiny wrapping paper? The best SP package ever, that’s what!

Continue reading “SP11 Package #3 – at last!”

Project 365 #2, Day 7-11: 16th – 20th Jan

Here are the next five days of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #2, Day 7-11: 16th – 20th Jan”

Reconnected.

Oh thank …. well, whoever that guy was in 2nd line support who finally figured out what the problem with my internets was. Which was that when BT had done some work at my local exchange on the day I lost my connection (Sat 26th), they had either deleted or not re-added (depending on what they’d been doing) my ISP’s domain to the list of ones that are allowed to connect. I spose no-one else uses that particular domain for their log-in round here – either that or it’s specific to each broadband enabled line. Actually, that would make more sense. Anyway, they’ve now put it back on the system and voila, I can connect. It’s liek magic, only with teknolegdgy *nods* I told them it was an authentication problem the first day it went wrong, but it took 10 days to get someone to figure out exactly where the trouble was. To be fair, the fact that BT were doing work on my exchange threw them off the scent so I had to wait for all sorts of tests and then a BT engineer to come out because everyone thought it was a line problem that just looked like an authentication thing… oh well. All better now!

So anyhow, I should probably get on with uploading the many many photos I have to put up, both for Project 365 and for my knitting progress. Which there has been lots of! I finished the Hedara socks and I’ve taken my Bigga jacket out of hibernation and begun the sewing up of that. Plus I’m still plugging away on the Chevron scarf of DOOM. Scarf in fingering weight = Never Again, as I think I’ve said before. But anyway, that’s all for another post really. I’m off to bed.