Alive, alive-oh

D’oh, I zoned out for a while there. I wish that would stop happening. My next psych appt isn’t until July, either. It was s’posed to be April or early May, but it got put back. :-/ Still, I can phone them if need be, so it’s not that bad.

Anyway, I haven’t been completely unproductive (read: asleep) over the last few weeks. I’ve been reading (I keep meaning to write reviews… I really will do that. Eventually), and knitting, which I shall talk about a bit more in a moment, and doing a bit of work on a fannish website project with Sann. And over the last couple of days I’ve been gradually putting some knitting / crochet books and some more yarn up for sale on eBay. I might even get the non-knitting things I have to clear out up there, if I can get around to taking photos and working out postage. I need a better pair of scales!

Actually, talking of scales, I may or may not have lost weight recently, but I have been eating more healthily. And without having to think about it too hard, either – it’s becoming more of a habit, which is really good. As well as that, I’m going to start doing more exercise again. I had meant to before, but I as part of the whole zoning out thing I was mainly stuck indoors. However, this morning I’m planning to either go for a walk in the park if I can get hold of Ally in time, or go to aquafit and then either the gym or just stay in the pool for a swim. I’ve got to get back into a routine where I’ve got something to get going for in the morning, and having something that I need to leave the house for is better. Otherwise I’m likely to faff around at the computer in my pyjamas until lunchtime! Quite possibly doing something productive, but still – I need that routine of being really “up and about”, and being actually dressed is part of that.

Back to the knitting, anyhow. Let’s see… looking back at those goals I set myself at the beginning of May, I’m afraid I still haven’t finished Mum’s present (I’m going to go and do some work on that in just a mo!). But as I said, I did finish the baby bootees, and I’ve also finished my second pair of socks – the Berlin Muster pattern – for the Sock Knitter’s Pentathlon. I hit my personal targets as well: I wanted to finish in the first 100, and to improve my sock knitting time. Which I did: I finished as number 68, on 23rd May, so it took me exactly 3 weeks to knit them, doing an average of an hour or two a day. :-) Since then, as well as Mum’s pressie I’ve been working on my Fireworks socks, and I’ve now finished the first one after a bit of a hiccup with the garter stitch toe the first go around (it ended up about twice as long as it should have been!). The second one of those is cast on and I’ll now be slowly making my way down the leg whenever I want to work on a project that requires very little concentration for the most part. I don’t have any pictures of that just yet, anyway, but I do have some of the finished objects. Want to see?….

Continue reading “Alive, alive-oh”

Project 365 #7, Days 45-51: 23rd – 29th Feb

Still catching up! Here’s the rest of February: days 45 to 51 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.
On to the pics (click them for the full sized versions):

Continue reading “Project 365 #7, Days 45-51: 23rd – 29th Feb”

Rebel rebel

My second pair of socks for the Pentathlon is underway. For this one, I think the main challenge is in the preparation (there was confusion over which translated version of the pattern and which chart was most accurate), and since it’s a 16 row lace pattern where the stitch count increases and decreases a couple of times, you have to keep your mind on what you’re doing. I’m not finding it too much of a problem though. Not mindless telly knitting, but fine for watching something where I don’t want to have my eyes glued to the screen the whole time and so can keep count.

However, I have rebelled a little ;-) The pattern recommends using solid or semi-solid colours, and I… have not. I was going to: I said in my last post that I was intending to use a solid red. But the lace pattern is a leafy sort of thing, and I just didn’t want to make it in red. It would probably look lovely in the Yarn Yard September Club yarn:

Photo of the Yarn Yard September Club Yarn

…. but much as I think that yarn is beautiful, if I make yet another pair of green socks right now I might lose the will to live. ;-) So that one was out.

Then I thought, well, it’s a really pretty pattern. (In fact, if ever a pattern said “knit me in pastel pink!” to me, it’s this pattern, but that’s never going to happen. Sorry pink, but I’ll never wear you. Ever.) It’s lace, but I’m not sure that a multi yarn would obscure the pattern completely. And the Yarn Yard Feb 08 ‘Art Deco’ club yarn is really really pretty: light blue, chocolate powder brown, cream, pale yellow, a hint of soft green. Really springlike. And I could use the minty blue-green contrast skein for the cuff, toes, and maybe the heels. So, that’s what I’ve cast on with. And I was right, this yarn is really pretty. However, so far I’m not entirely sure if it’s knitting up as a pretty lacy sock, or a small woolly pizza. Below is a photo of the cuff and first lace repeat. Any thoughts, anybody:

Photo of my Pentathlon pair #2, cuff and first lace repeat

Anyway, here are the project stats as they stand at the moment:
Pattern: Berlin Muster by Kristin Benecken [Ravlink]
Yarn: The Yarn Yard Bonny (previously Sock) in Art Deco (Feburary 08 Sock Club yarn)
Needles: 2.5mm DPNs
Ravelry Project Page: Pentathlon Pair #2

If I do decide to change the yarn, I’ll definitely stay with Yarn Yard Bonny as it’s just perfect for the project, and I think I’d either go for the solid bright blue from the November club yarn or persuade myself that three pairs of green socks in five months would be fine, and use the above August one. I’m hoping that the Art Deco will work out alright, though. Not least because I’ve set myself the goal of coming in within the first 100 this time…

Project 365 #6, Days 35-44: 13th – 22nd Feb

Since I’m still playing catch up, here’s yet another picdump: days 35 to 44 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #6, Days 35-44: 13th – 22nd Feb”

Progress from last week.

Last week, I bribed myself by setting a list of goals to achieve before I could have my “carrot” of casting on a lovely new pair of socks. Sooooooo, how did I do?

  • Finish unpicking the cast off of the second Jacobean sock and re-do it with a tubular bind-off (first sock already successfully done, yay);
    — Done! And oh, I love them. They’re scrummy and squishy and now fit perfectly. LOVE!
  • Finish one repeat of the WFS edging;
    — I now have several repeats done, which is sort of good. But not ideal, since I passed my deadline for finishing the thing. D’oh! I’m still plugging away and enjoying it, though.
  • Do the finishing for the two pairs of baby bootees (which honestly isn’t going to take long! I’ve just been procrastinating), which means: seam up the flat knit pair, make knitted buttons for both and attach them, make the button loops, sew in any ends;
    — DONE. Why do I make such drama in my own mind over things that really aren’t that terrible (such as sewing up one tiny bootee)? Dear self: stop it!! I’ll make another post soon with some pictures.
  • Stop mentally flailing over which yarn I should use for the next Pentathlon project because really, I can’t choose properly until I see what the pattern is (although I’m sure I will be posting a short list of my possible choices here like I did last time);
    — I’ve pretty much managed this. In fact, I’m not even going to post a short list. I think I’m going to use some YY sock in bright red “Shelter”, since the guidelines say that a solid or semi-solid is best, and light – medium and/or bright colours are suggested. Plus, I already have that one wound into a yarn cake ;-) I’ll make my final decision when the pattern comes online late tonight.

And my prize? Wheeee, I’ve cast on for the lovely Bracket Fungus socks. My version are the Bracket Fungoths, because I’m using YY Hot Pink Goth yarn as the multi colour and I never can resist a good (bad) pun. As I promised myself, I’ve only done the cuff so far because the WFS has to take priority for now, but here’s how it’s looking so far:

Cuff of my Bracket Fungus socks

Yay!

Project 365 #5, Days 25-34: 3rd – 12th Feb

More catching up! Here are days 25 to 34 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #5, Days 25-34: 3rd – 12th Feb”

Project 365 #4, Days 17-24: 26th Jan – 2nd Feb

I’m still catching up, so I’ve put a few more days in at once this time. So here are days 17 to 24 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #4, Days 17-24: 26th Jan – 2nd Feb”

Project 365 #3, Days 12-16: 21st – 25th Jan

Still playing catch-up with posting these, here are the next five days of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #3, Days 12-16: 21st – 25th Jan”

SP11 Package #3 – at last!

Due to mania, server crash and my sieve-like memory, I hadn’t posted my final SP11 package squee-ing. So here it is now. I did mention on 3rd December that I’d received it, but that was as far as I got. (In that post I also mentioned that I’d been delayed in sending my final package out to my spoilee. Well, it’s still here – my money situation has meant I haven’t been able to find the postage yet. But it belatedly occurred to me that some virtual gifts were possible, and I’m putting a bit of cash by each week to send the non-virtual things! Also, I said that I had a new design for this site. As you can see, that’s not in place yet either. Hopefully soon, though!)

Anyway! Even though the package arrived at the beginning of December, it was all Christmas themed and wrapped. Hee!

Photo of my SP11 package #3 in the box Photo of my SP11 package #3 pressies
Not that I let that put me off opening everything right then, of course. I did think very briefly about saving it all for Christmas, but… nah. So what was inside all that shiny wrapping paper? The best SP package ever, that’s what!

Continue reading “SP11 Package #3 – at last!”

Project 365 #2, Day 7-11: 16th – 20th Jan

Here are the next five days of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #2, Day 7-11: 16th – 20th Jan”

Project 365 #1 – Day 1-6: 10th – 15th Jan

I mentioned in my last post that I was thinking about doing Project 365. A couple of days later I decided that if I was going to do it, then I’d better just start before I started thinking about it too much. So I did.

Which means that I will, all going well, be posting a photograph for every day from 10th January 2008 to 9th January 2009. I’m planning to make a post every five days or so. In actual fact, I might post more than one photo for some days – this is to stop myself getting mired in indecision! I’ve set up a specific folder in the photo album for the set of photos to go in, as well. I won’t be putting them on Flickr or adding them to any group sets there, though I have joined the Ravelry group for 365-ers, and I’m intending to join the webring.

Anyway, that’s enough rambling on the theory. On to the photos (click ’em for the full size versions):

Continue reading “Project 365 #1 – Day 1-6: 10th – 15th Jan”

I think you’re great, but I’m going to have to let you go…

If you love something, let it go… and other clichés. The grand de-stashing has begun! I’ve actually ended up being fairly ruthless and turfed out a lot of yarn on the basis that I don’t have any specific project in mind for it. It might be gorgeous, but unfortunately, I need the cash more. You see, a few things happened, including my washing machine having a very dramatic last hoorah (it was trying to throw itself out the kitchen window, I’m sure of it) and now I’m kind of hideously broke. The yarn, she is not necessary. So, here goes. I’m not putting pictures up in this entry because it would get too big, but there are links so you can click through to the photos. Or if you like you can jump to the yarn sale section of my photo album – all pictures but two are there.

Is what’s below everything that I’m clearing out? Well, no. As it just so happens, I’ve got some more yarn on eBay. And I’m also destashing some of my knitting books. I’ll make another post about those!

Continue reading “I think you’re great, but I’m going to have to let you go…”

Autumnal Spring Cleaning

I’ve been having a really good clear-out over the last few weeks, and I’m starting to feel less mentally cluttered as well already. I’ve even eBayed more of my yarn. I know! Can I really be breaking my hoarding mentality? Well, no, not if you look at my bookshelves (MY books *clings*) and, uh, the remainder of my yarn stash. Not to mention the contents of my wardrobe and drawers… and a couple of suitcases… However, I am going to eBay some more stuff. Not yarn this time (although I might be able to persuade myself to part with a couple more skeins), but things like my spare Palm cradle (never used) and serial cable (not used since approx 3 computer upgrades ago)… oh, and I’m sure there are some other things. I have also sorted out more clothes and knick-knacks etc to go off to the charity shop. I think I still have more to do there, though!

Unfortunately, I’ve been a bit stalled on the whole thing because I’m still ill. Bleuch. I left the flat yesterday for the first time in about 2 weeks (alright, maybe my mental health hasn’t been ideal: being stuck indoors ill was threatening to push me into a ‘down’, but I think I’ve caught it in time) because I had to go to the Post Office, and stopped in to speak to the pharmacist on the way. She reckons I have bronchitis or a chest infection, and what with being asthmatic already, I’ve been told to go to the doctor tout de suite. I know, I know, I should have gone a week ago. I am Procrastination Woman. In this case, that’s particularly stupid of me since it means I’ve been propped at a weird angle in bed for several days since I can neither sit/stand up or lay down normally and breathe comfortably. V annoying. Oh well. I have an appointment this afternoon. I’ll be fixed soon. On the plus side, this whole thing seems to have sorted out my insomnia / wonky body-clock thing that I had going on: I’m now tired / sleeping during the actual night again, instead of being awake all night and tired or asleep all day. Hoorah!

In knitting news, I have got some work done on my WIPs. I really must remember to make a couple of posts about my current WIPs and recently completed FOs to spring-clean that off my mental to-do list. Mainly I’ve been working on “Mmm, Refreshers”, which is a Christmas gift. Can’t say anything else about it in case the recipient trundles over here. You never know with my friends and family *peers around suspiciously*. I’ve also done a bit of “WFS” (likewise, Christmas), and some of my Fireworks socks… which are for me me me, so there. Obviously I finished my Tête à Fetching (wore it when I went out yesterday), and I’m really chuffed with the response – some people have said they like it and want to make it, it’s in a few queues (and one in-progress!) on Ravelry, and I even got a really lovely comment from Cheryl Niamath who designed the Fetching gloves. :-) I’ll get the scarf pattern written up soon-ish as well, but I want to make a wider version of it for Mum first. Once I’ve finished something else, that is.

I actually think my WIP tolerance has been reached. If I cast on one more project, my head would explode. I can cope, just about, with the number I have going at once right now (8 plus 3 in hibernation) because I have a definite Christmas deadline for, um, three of them. Although I have at least two more things I wanted to cast on for gift knitting as well. Oh dear. But I’m not going to think about that now! The thing is, those gift knits are the ones which are taking priority, and the rest are pushed to the back-burner. Some more than others – I’m still working on my various pairs of socks (for me) every now and again, to give myself a break. It seems to be working. But anyway, like I said, I’ll make a proper all-about-my-WIPs post a bit later.

I didn’t find my gloves, by the way. So far I’ve been wearing my Fetchings or my Hurry Up Spring fingerless ones, but I’ve wound a skein of Yarn Yard Merino sock into a ball to make some new ones – I think I’m going to make cabled ones with that. And I did crumble and get ones of the glove kits, so I’m going to make a pair with that too.

Photo of Yarn Yard Merino Sock yarn 'Damson' Photo of Yarn Yard Glove kit yarn 'Olive-ish'

Yay, gloves! I’m not allowing myself to cast on for them until I’ve finished a couple of my current WIPs, though. Preferably the Christmas gift ones, since those have a deadline!

Hmm, was there anything else I was going to say? I can’t think… oh! I remember. I found a (the) Holiday Gift KAL-CAL. Just what I wanted! I have duly signed myself up. Um. Oh yes, and I’ve been working on my next (final? I’m not sure if I’ll be sending one more package or if I’ll split it into two – Katie, do you have any preferences?) SP11 package. Mwahaha. Etc. ;-)

Right, that’s enough being upright for me for the time being. I’m going back to bed for a bit to listen to the radio / podcasts while knitting, then I shall get up again, have foooood, and get myself off to the doctor’s. TTFN!

Mid Sock Syndrome?

You know, it’s funny. I don’t tend to be struck down with Second Sock Syndrome. I don’t always cast on a second sock the instant I’ve finished the first if I’ve got other projects on the go that I want to work on before I go back to the sock knitting. But by and large, my second socks seem to knit up faster than the first ones… probably because I already have the pattern fixed in my head. Halfway through my Whitby sockWhat I do get, though, is ‘Mid Sock Syndrome’. Is it just me? I start a new sock (so far I’ve only knit top-down, so I can only talk about that) and the ribbing, if there is any, might feel relatively slow, but once I get onto the main part of the leg: zoom! Before I know it, I’m at the heel flap. At that point, time grinds to a halt or something. What’s really weird here is, the various parts of heel flap, heel turn and even gusset decreases don’t seem to take all that long. But somehow, all together, they take an age. And then there’s the foot. For some reason this didn’t happen for the Monkey socks – the foot of those flew by – but in general, the foot takes for EVAH. Which makes no sense, because my feet are small and therefore the foot part of a sock is much shorter than the leg.

Perhaps it’s that I’ve gone past the point of being interested in the pattern because it’s new, and also past the gratification of having learned it, so it starts knitting up faster. Is it sock fatigue? I seem to constantly be checking the foot length to make sure I haven’t gone too far, and seeming to still have miles before the toe decreases start. Don’t get me wrong, I still love the sock knitting. But I suppose by the time I get to that part, I just want the flipping thing to be finished! I guess I’ll just have to be grateful that starting that second sock makes it all new and exciting again…. :-)

Hi, my name is…

…and I’m a yarnaholic. Although when I follow that analogy through, perhaps it’s not quite accurate. Because it’s not my actual consumption of yarn that’s the issue. No, it’s that like many many knitters I have a little tiny stash problem. But then again, if yarnaholic = addicted to yarn, then I spose that works. The point is – and I do, usually, get to my point ;-) – I’ve come to the reluctant realisation that I have Too Much Yarn.

You see, I’ve been cataloguing my stash on the wonderful Ravelry, and this has meant hoiking out yarn that I haven’t even seen for about three years. And I’ve realised a couple of things about all this yarn. To me, “too much yarn” doesn’t mean that I have more yarn than I’m likely to use in the near (or far) future. It means that I have specific yarn that I now can’t see myself ever using for anything. In general, that’s yarn that I bought because it was too good of a bargain to pass up. Ahem. Well, we all do it!

So, what I have at the moment is pretty much this:
The majority of The Stash, Oct 07

Doesn’t look tooooo bad, does it? Although when you bear in mind that of course the bags and basket are really packed full of yarn that you can’t see properly in the picture… Um. And I also have a large-ish box full of machine knitting yarn under my bed that I haven’t brought myself to drag out yet. Yeah, I need to start knitting faster. And knitting larger things again: I have the yarn for more than a couple of jumpers / cardigans. The top two boxes by the telly house my sock yarn. They’re a bit jammed. Oh dear, I’d better knit myself more socks. Shame!

So, what I’ve done is gone through everything and sorted out some things to go to charity, and some things to be sold on eBay. The ones that I’ve put on eBay are yarns that I bought because I liked at the time… but as I said above, I’m really never going to actually knit with them. They need to go to someone who can use them. For example, there was a time when I bought an awful lot of mohair because it was pretty and fuzzy and also very reasonable in the LYS. I did my typical thing of “ooo, I like! I shall have that colour and that colour and that colour, and…”. Yes. Four years later, I’ve knitted some of that yarn up, and now I just don’t have a use for the other colours of it! Some of it, I really do love the colour… for a hat, for example. Which I don’t want to make in that kind of yarn. Doh! But you learn these things with experience.

Therefore, to eBay it has gone. There are five lots of mohair (80-90% mohair or mohair/wool and acrylic blends), one lot of Jaeger Cadiz (silk/viscose), two lots of 100% wool fingering weight, and a Colinette pattern book. Help me de-stash!

Once I’d done that, I decided to work out, with the help of Lixie’s Stashtimator, how much yarn I now have left. Oh dear. Like I said before, I’ve got to start knitting faster, and most importantly knitting from my stash. Because I have:
Laceweight: 238g = 1.6 miles
4-ply / Fingering: 5805g = 13.2 miles (of that, Sock yarn: 3810g = 8.7 miles)
DK: 9640g = 13 miles
Aran: 3995g = 3.8 miles
Chunky: 1915g = 1.6 miles
Super Bulky: 1100g = 0.9 miles
TOTAL: 57626g = 34.2 miles

From now on, then, I’m on a yarn diet. This does not mean no more yarn: food dieting doesn’t mean stopping eating, after all! What I’m going to pledge to myself is to buy no more yarn for larger projects until I’ve used the yarn I already have, unless it’s for a gift (honestly: unlikely… gifts will probably be smaller things!), and to budget the amount of sock yarn / single skeins that I can buy. Yes, in this case, sock yarn does count as stash. Somewhat. ;-) Again, yarn for gifts and commissions doesn’t count, but I am going to try to knit from my stash for those as well where possible.

…… Wish me luck? (And buy my eBayed yarn! ;-) )