Project 365 #6, Days 35-44: 13th – 22nd Feb

Since I’m still playing catch up, here’s yet another picdump: days 35 to 44 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #6, Days 35-44: 13th – 22nd Feb”

Progress from last week.

Last week, I bribed myself by setting a list of goals to achieve before I could have my “carrot” of casting on a lovely new pair of socks. Sooooooo, how did I do?

  • Finish unpicking the cast off of the second Jacobean sock and re-do it with a tubular bind-off (first sock already successfully done, yay);
    — Done! And oh, I love them. They’re scrummy and squishy and now fit perfectly. LOVE!
  • Finish one repeat of the WFS edging;
    — I now have several repeats done, which is sort of good. But not ideal, since I passed my deadline for finishing the thing. D’oh! I’m still plugging away and enjoying it, though.
  • Do the finishing for the two pairs of baby bootees (which honestly isn’t going to take long! I’ve just been procrastinating), which means: seam up the flat knit pair, make knitted buttons for both and attach them, make the button loops, sew in any ends;
    — DONE. Why do I make such drama in my own mind over things that really aren’t that terrible (such as sewing up one tiny bootee)? Dear self: stop it!! I’ll make another post soon with some pictures.
  • Stop mentally flailing over which yarn I should use for the next Pentathlon project because really, I can’t choose properly until I see what the pattern is (although I’m sure I will be posting a short list of my possible choices here like I did last time);
    — I’ve pretty much managed this. In fact, I’m not even going to post a short list. I think I’m going to use some YY sock in bright red “Shelter”, since the guidelines say that a solid or semi-solid is best, and light – medium and/or bright colours are suggested. Plus, I already have that one wound into a yarn cake ;-) I’ll make my final decision when the pattern comes online late tonight.

And my prize? Wheeee, I’ve cast on for the lovely Bracket Fungus socks. My version are the Bracket Fungoths, because I’m using YY Hot Pink Goth yarn as the multi colour and I never can resist a good (bad) pun. As I promised myself, I’ve only done the cuff so far because the WFS has to take priority for now, but here’s how it’s looking so far:

Cuff of my Bracket Fungus socks

Yay!

Project 365 #5, Days 25-34: 3rd – 12th Feb

More catching up! Here are days 25 to 34 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #5, Days 25-34: 3rd – 12th Feb”

Project 365 #4, Days 17-24: 26th Jan – 2nd Feb

I’m still catching up, so I’ve put a few more days in at once this time. So here are days 17 to 24 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #4, Days 17-24: 26th Jan – 2nd Feb”

A yarny blind date

I’ve signed up for the Sock Knitter’s Pentathlon (for which there are Ravelry and Yahoo groups) because, well, I liked the look of it. The group summary goes:
In honor of the upcoming Summer Olympics in Beijing, a sock knitter’s pentathlon is being organized. This group will test your sock knitting skills. During the course of the year, competitors will knit 5 pairs of socks in 5 different styles.

That means a pair of socks in each two month period starting from 1st March. Having two months to complete a pair of socks feels do-able for me, where other groups that are doing a pair of socks a month, for example, send me into a panic just thinking about it. Two months gives me some breathing space! There is, of course (since this is an ‘Olympic’ event *g*) a competitive element to the Pentathlon – there are points awarded according to how you place in the finished socks stakes. But if you don’t complete a sock in the allotted time, even though you’re then eliminated from the competition element of the group, you can still knit along for the rest of the patterns for the fun of it. Perfect!

However! As I said, the kal / competition begins on 1st March – just over a day away. That’s when the first pattern will be released… all we know so far is that the yarn we will need should knit to 8 sts per inch on 2.5mm (or thereabouts) needles, and that solid or semi-solid yarns will work best. Being on a yarn diet, I’m obviously not buying anything new and I hardly need to with the amount of sock yarn in my stash. But I can’t decide what to use! Heeeeelp! I feel like, because I don’t know what the pattern looks like yet, I can’t choose the yarn / colour that will look best. Maybe I should just wait until the pattern comes out, but then I’ll have to think about which yarn to pick and then rewind it, all of which will be cutting into my knitting time… and I know I wasn’t particularly going to do the competition element of this, but I’d kind of like to see how I can do at it anyway.

I have narrowed my choices down a bit, though, so maybe I could get some opinions? Have a look at the poll below…

Continue reading “A yarny blind date”

Project 365 #3, Days 12-16: 21st – 25th Jan

Still playing catch-up with posting these, here are the next five days of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #3, Days 12-16: 21st – 25th Jan”

SP11 Package #3 – at last!

Due to mania, server crash and my sieve-like memory, I hadn’t posted my final SP11 package squee-ing. So here it is now. I did mention on 3rd December that I’d received it, but that was as far as I got. (In that post I also mentioned that I’d been delayed in sending my final package out to my spoilee. Well, it’s still here – my money situation has meant I haven’t been able to find the postage yet. But it belatedly occurred to me that some virtual gifts were possible, and I’m putting a bit of cash by each week to send the non-virtual things! Also, I said that I had a new design for this site. As you can see, that’s not in place yet either. Hopefully soon, though!)

Anyway! Even though the package arrived at the beginning of December, it was all Christmas themed and wrapped. Hee!

Photo of my SP11 package #3 in the box Photo of my SP11 package #3 pressies
Not that I let that put me off opening everything right then, of course. I did think very briefly about saving it all for Christmas, but… nah. So what was inside all that shiny wrapping paper? The best SP package ever, that’s what!

Continue reading “SP11 Package #3 – at last!”

Project 365 #2, Day 7-11: 16th – 20th Jan

Here are the next five days of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.

On to the pics (click them for the full sized versions):

Continue reading “Project 365 #2, Day 7-11: 16th – 20th Jan”

Project 365 #1 – Day 1-6: 10th – 15th Jan

I mentioned in my last post that I was thinking about doing Project 365. A couple of days later I decided that if I was going to do it, then I’d better just start before I started thinking about it too much. So I did.

Which means that I will, all going well, be posting a photograph for every day from 10th January 2008 to 9th January 2009. I’m planning to make a post every five days or so. In actual fact, I might post more than one photo for some days – this is to stop myself getting mired in indecision! I’ve set up a specific folder in the photo album for the set of photos to go in, as well. I won’t be putting them on Flickr or adding them to any group sets there, though I have joined the Ravelry group for 365-ers, and I’m intending to join the webring.

Anyway, that’s enough rambling on the theory. On to the photos (click ’em for the full size versions):

Continue reading “Project 365 #1 – Day 1-6: 10th – 15th Jan”

I think you’re great, but I’m going to have to let you go…

If you love something, let it go… and other clichés. The grand de-stashing has begun! I’ve actually ended up being fairly ruthless and turfed out a lot of yarn on the basis that I don’t have any specific project in mind for it. It might be gorgeous, but unfortunately, I need the cash more. You see, a few things happened, including my washing machine having a very dramatic last hoorah (it was trying to throw itself out the kitchen window, I’m sure of it) and now I’m kind of hideously broke. The yarn, she is not necessary. So, here goes. I’m not putting pictures up in this entry because it would get too big, but there are links so you can click through to the photos. Or if you like you can jump to the yarn sale section of my photo album – all pictures but two are there.

Is what’s below everything that I’m clearing out? Well, no. As it just so happens, I’ve got some more yarn on eBay. And I’m also destashing some of my knitting books. I’ll make another post about those!

Continue reading “I think you’re great, but I’m going to have to let you go…”

Falling off the yarn wagon

Ummmm….. it was my birthday and I’ll buy yarn if I want to?

So, I know I said I wasn’t going to buy any more yarn, and lord knows, I don’t exactly need any. Seriously, I’m all yarned out. You know that – you’ve seen my stash. I have lots. But those sock yarns are just so scrummy, and apparently don’t count towards your stash anyway. Of course they still dent your bank balance a bit, but whoops, too late now! But it was my birthday last month, so I treated myself to some yarn that I had been stalking for a while. And then I decided that that’ll be it until… well, until I’ve knitted a lot of it up!

That wasn’t me falling off the yarn wagon, though – at that point, I wasn’t even on it despite my oh so good intentions. I was the person half-heartedly jogging along behind the wagon, occasionally making a vague jump up but not quite getting on board. But last month when I began clearing out my stash, I made my yarn diet ‘resolution’. I was then really good and resisted all yarn except for the YY glove kit that I already mentioned… which I justified because [a] it’s for something I need (gloves) [b] it counts as my sock yarn allowance, and [c] the money for it came from the yarn I’d sold on eBay.

Debbie Bliss Rialto DK yarnHowwwwwever, I tripped and bought yarn and stuff after Knit & Natter last Saturday. The fatal flaw with K&N is that I’d have to leave early to catch my bus back home… and I don’t want to do that. So that leaves me with almost an hour to kill when it finishes. Of course I’m going to go to the yarn shop (the group meets in the pub opposite). Actually I still haven’t broken my yarn diet rules1, but I feel kind of bad nevertheless. Regia Design Line Kaffe Fassett yarn I got some Debbie Bliss Rialto DK, which is for a Christmas gift and was a planned purchase, and some sock yarn – Regia’s Kaffe Fassett Design Line in Mirage Fire, which I think is new. I refrained from buying more than one lot of sock yarn, though, so at least that’s something! *g* I did succumb to the lure of a couple of Addi Turbo bamboo circular needles, though. I’m using one pair already, and they are lovely and smooth with a non-tangley cord and all. But the join between the bamboo and the bit that connects it to the cord isn’t smooth. There’s a definite jump that the stitches catch on all the time. :-/ Still, maybe I can do something about it. I really hope so, because they’re lovely in every other respect, and I don’t want to spoil the very nice yarn that’s being knit on them. Anyone have any advice about that?

So yeah, I haven’t technically fallen off the wagon, but I felt the need to confess my purchases anyway. That’s probably the best way of keeping on top of what I do buy within my allowance and making sure I don’t slip. Keep it all public so I’ll be too embarrassed to fail! Think it’ll work?

1 To re-cap:

  1. No more yarn for larger projects until I’ve used the yarn I already have in my stash which is mentally assigned to things in my queue.
  2. Budget the amount of sock yarn / single skeins that I can buy: this will be sock club yarn plus an allowance of £15 a month max. This should probably also cover needles and notions as well, come to think of it. And books.
  3. Yarn for gifts and commissions doesn’t count, but I am going to try to knit from my stash for those as well where possible.

Autumnal Spring Cleaning

I’ve been having a really good clear-out over the last few weeks, and I’m starting to feel less mentally cluttered as well already. I’ve even eBayed more of my yarn. I know! Can I really be breaking my hoarding mentality? Well, no, not if you look at my bookshelves (MY books *clings*) and, uh, the remainder of my yarn stash. Not to mention the contents of my wardrobe and drawers… and a couple of suitcases… However, I am going to eBay some more stuff. Not yarn this time (although I might be able to persuade myself to part with a couple more skeins), but things like my spare Palm cradle (never used) and serial cable (not used since approx 3 computer upgrades ago)… oh, and I’m sure there are some other things. I have also sorted out more clothes and knick-knacks etc to go off to the charity shop. I think I still have more to do there, though!

Unfortunately, I’ve been a bit stalled on the whole thing because I’m still ill. Bleuch. I left the flat yesterday for the first time in about 2 weeks (alright, maybe my mental health hasn’t been ideal: being stuck indoors ill was threatening to push me into a ‘down’, but I think I’ve caught it in time) because I had to go to the Post Office, and stopped in to speak to the pharmacist on the way. She reckons I have bronchitis or a chest infection, and what with being asthmatic already, I’ve been told to go to the doctor tout de suite. I know, I know, I should have gone a week ago. I am Procrastination Woman. In this case, that’s particularly stupid of me since it means I’ve been propped at a weird angle in bed for several days since I can neither sit/stand up or lay down normally and breathe comfortably. V annoying. Oh well. I have an appointment this afternoon. I’ll be fixed soon. On the plus side, this whole thing seems to have sorted out my insomnia / wonky body-clock thing that I had going on: I’m now tired / sleeping during the actual night again, instead of being awake all night and tired or asleep all day. Hoorah!

In knitting news, I have got some work done on my WIPs. I really must remember to make a couple of posts about my current WIPs and recently completed FOs to spring-clean that off my mental to-do list. Mainly I’ve been working on “Mmm, Refreshers”, which is a Christmas gift. Can’t say anything else about it in case the recipient trundles over here. You never know with my friends and family *peers around suspiciously*. I’ve also done a bit of “WFS” (likewise, Christmas), and some of my Fireworks socks… which are for me me me, so there. Obviously I finished my Tête à Fetching (wore it when I went out yesterday), and I’m really chuffed with the response – some people have said they like it and want to make it, it’s in a few queues (and one in-progress!) on Ravelry, and I even got a really lovely comment from Cheryl Niamath who designed the Fetching gloves. :-) I’ll get the scarf pattern written up soon-ish as well, but I want to make a wider version of it for Mum first. Once I’ve finished something else, that is.

I actually think my WIP tolerance has been reached. If I cast on one more project, my head would explode. I can cope, just about, with the number I have going at once right now (8 plus 3 in hibernation) because I have a definite Christmas deadline for, um, three of them. Although I have at least two more things I wanted to cast on for gift knitting as well. Oh dear. But I’m not going to think about that now! The thing is, those gift knits are the ones which are taking priority, and the rest are pushed to the back-burner. Some more than others – I’m still working on my various pairs of socks (for me) every now and again, to give myself a break. It seems to be working. But anyway, like I said, I’ll make a proper all-about-my-WIPs post a bit later.

I didn’t find my gloves, by the way. So far I’ve been wearing my Fetchings or my Hurry Up Spring fingerless ones, but I’ve wound a skein of Yarn Yard Merino sock into a ball to make some new ones – I think I’m going to make cabled ones with that. And I did crumble and get ones of the glove kits, so I’m going to make a pair with that too.

Photo of Yarn Yard Merino Sock yarn 'Damson' Photo of Yarn Yard Glove kit yarn 'Olive-ish'

Yay, gloves! I’m not allowing myself to cast on for them until I’ve finished a couple of my current WIPs, though. Preferably the Christmas gift ones, since those have a deadline!

Hmm, was there anything else I was going to say? I can’t think… oh! I remember. I found a (the) Holiday Gift KAL-CAL. Just what I wanted! I have duly signed myself up. Um. Oh yes, and I’ve been working on my next (final? I’m not sure if I’ll be sending one more package or if I’ll split it into two – Katie, do you have any preferences?) SP11 package. Mwahaha. Etc. ;-)

Right, that’s enough being upright for me for the time being. I’m going back to bed for a bit to listen to the radio / podcasts while knitting, then I shall get up again, have foooood, and get myself off to the doctor’s. TTFN!

Under the weather…. but presents cheer me up!

Oh, ick. I’ve been somewhat under the weather (physically… my mental health is still good, hoorah) for the last few days, and I thought I had a cold. But now I have the sneaking feeling that it might be something that’ll need antibiotics. Blech. I have that weird hollow-yet-tight feeling in my chest, I haven’t been able to breathe properly for a few days, and every muscle in my chest and upper back hurrrrrrts. *whine whine whine* And now I have that swollen-gland thing going on. There’s probably no point in going to the doctor just yet – I’ll wait a few more days and see if it goes away on its own. Although this has reminded me that I should get my flu jab done!

Anyway, I’m not going to moan on about that any more. If I disappear for a few days, I’ll probably be wrapped up warm in bed. Knitting, naturally. Hopefully it won’t come to that, though (the having to stay in bed, not the knitting – the knitting will no doubt happen anyway). :-)

So, on to the good stuff! I got my second SP11 package!! Wheeee, thank you Janey! :-D

SP11 package #2

Continue reading “Under the weather…. but presents cheer me up!”

Composing Knits

I’ve discovered something kind of interesting. To me, anyway. Fetching wristwarmersYou see, I’d decided I wanted a hat to go with my Fetching wristwarmers. This meant applying the stitch pattern and cables used on Fetching to a hat. Well, with a couple of small variations – aren’t there always? What I’ve discovered is, I approach knitting designing in the exact same two ways I have of approaching music composition.

Usually when I make a hat (or scarf or bag or whatever), I almost completely improvise. Often, I don’t even swatch, I just rely on the fact that I know that I’ll get this approximate gauge with those needles and that weight yarn, and base my number of cast on stitches on that. I’ll keep to approximate guidelines – just like staying within a key (or its relatives) – but otherwise I’ll wing it from there… sometimes even in terms of stitch pattern, although not always. If it works out well, I might go back and record what I’ve done on paper later on.

This time, I used what is actually my other method of writing music: I take a motif that I’ve worked out on an instrument beforehand, then decide on a key, key sig, and orchestration, and write everything else straight down onto paper out of my head. I’m pretty sure I know how it’s going to sound, but there’s sometimes the odd surprise *g*. Along very much the same lines, I started the design for my “Tête à Fetching” hat by taking the motif of the Fetching wristwarmers cables / ribbing which I have already knitted and therefore am familiar with the look of it. I swatched, I calculated, and I wrote out the provisional pattern on paper, including variations which didn’t occur in the original motif. Now, I’m knitting it:

The beginning of the Tête à Fetching

I’ll let you know how it goes, and with luck put the finished pattern up when I’m done!

Mid Sock Syndrome?

You know, it’s funny. I don’t tend to be struck down with Second Sock Syndrome. I don’t always cast on a second sock the instant I’ve finished the first if I’ve got other projects on the go that I want to work on before I go back to the sock knitting. But by and large, my second socks seem to knit up faster than the first ones… probably because I already have the pattern fixed in my head. Halfway through my Whitby sockWhat I do get, though, is ‘Mid Sock Syndrome’. Is it just me? I start a new sock (so far I’ve only knit top-down, so I can only talk about that) and the ribbing, if there is any, might feel relatively slow, but once I get onto the main part of the leg: zoom! Before I know it, I’m at the heel flap. At that point, time grinds to a halt or something. What’s really weird here is, the various parts of heel flap, heel turn and even gusset decreases don’t seem to take all that long. But somehow, all together, they take an age. And then there’s the foot. For some reason this didn’t happen for the Monkey socks – the foot of those flew by – but in general, the foot takes for EVAH. Which makes no sense, because my feet are small and therefore the foot part of a sock is much shorter than the leg.

Perhaps it’s that I’ve gone past the point of being interested in the pattern because it’s new, and also past the gratification of having learned it, so it starts knitting up faster. Is it sock fatigue? I seem to constantly be checking the foot length to make sure I haven’t gone too far, and seeming to still have miles before the toe decreases start. Don’t get me wrong, I still love the sock knitting. But I suppose by the time I get to that part, I just want the flipping thing to be finished! I guess I’ll just have to be grateful that starting that second sock makes it all new and exciting again…. :-)