P is for Projects

I had a sudden bout of startitis today (the urge to cast on new knitting projects) but I’ve managed to restrain myself!  Why did I do that?  Well, for the last… oh, good while, I’ve been resolved to finish the projects I currently have on the needles before I start anything new.  I’ve got a lot of things that have been meandering along for a long time – I have started and completed other projects in the mean time, but I haven’t finished these others.  So I’m making an effort to do that now.

The thing that’s helped me the most with doing that is that I decided to pick a “WIP of the Week” every Friday, and concentrate on that project for the next seven days. I’m not forbidding myself from knitting on my other WIPs if I feel like it, but I’ll be focussing on the one that I’ve picked and hopefully be doing the most work on that.  I haven’t kept that up completely all the time, but it’s certainly helped before so I’m going to try it again.

When I first started it, it worked like a dream – I finished my first three picks very quickly that way. At the moment, I have two – the Menace jumper, which is a UFO (I count something as a UFO rather than a WIP if it’s been hibernating and not worked on for ages) and now only needs seaming, and the Clapotis scarf which is somewhat more portable. By the end of this week, I intend to have finished the straight portion of the scarf, and made a start on the jumper seaming. Although if I haven’t managed that, it doesn’t matter – I’m not aiming to finish the projects within each week, just to get as much work done on them as possible.

So, the current WIP(s) of the Week will be at the top of the “Currently” section of my sidebar. Below them are my Ravelry-powered progress bars for my In Progress and Hibernating projects. The hibernating ones are greyed out and italicised (and if you want to know how I got it to do that, drop me a line – it involved some code wrangling that I’d be happy to share with anyone interested). The links go to the Ravelry project pages, so I’m afraid if you’re not a member you won’t be able to get in unless I remember to set them as ‘open’.  Or at least I think that’s how it works.  Although if you’re not a member and are a knitting/crochet/spinning fan, I’d definitely recommend you go and sign up – it’s a fabulous site :-)

Anyway, I thought I’d do a round-up (with pictures) of my current lot of WIPs and UFOs. And project details for those I haven’t mentioned on here before.

Continue reading “P is for Projects”

12: What I’ve been knitting

I’ve been doing a bit of knitting… although I need to go and cook soon.  Anyway, these are what I’m working on right now:

Entrelac socks in progress

I’m a little worried I won’t have enough yarn for two whole socks, which is why I’ve stopped just short of the toe decreases (yes, my feet are that small) on the first one and started the second.  I’m going to see how well the yarn seems to be doing on the way down the leg of sock 2, then decide whether I’ll need to rip back the first one and only have 3 pattern repeats for the leg instead of 4.  Hopefully I won’t need to…

On Giving In Gracefully

So, back in March I made some bloggy resolutions about what I intended to do for weekly posting goals.  Obviously, I haven’t kept those up… and then I started feeling like I was in catch-up mode all the time with myself, and oh noes, panic!!  Which is bad, since this blog isn’t supposed to be a duty!  Therefore, I have Made A Decision: I’m giving myself permission to “give up”.  In actual fact what that means is that I’m going to forget about Project 365 this year, since taking the photos already wasn’t working out – maybe I can go again another year, but I’ll see how it goes.  I’m still going to do the Friday 5 whenever I feel like it, but not necessarily every week.  I am going to try to post more about knitting and spinning and things in general.  This way, it’s more of an adjustment of my goals to something more realistic, rather than really giving up.

Another thing that I’ve decided to let go of is taking strict part of the Sock Knitter’s Pentathlon ’09.  I haven’t been knitting very fast this year, and I’d ended up knitting nothing but those socks and still not finishing them.  It all got a bit too much like hard work!  So even though I love the patterns for the first two socks, and I really like the look of the third one which has recently been released, I’m not going to start #3.  I do intend to finish the first two socks, but not as my most immediate projects.  Instead I’m going to go back to my other knitting works in progress and try to get those finished off.  They’d been pushed back while I was knitting just socks.  That’s meant that I’ve now almost finished the shawl I’ve been making for Emily (I’m casting off at the moment, but that’s deadly boring so I’m just doing a few stitches at a time then putting it down again *g*).  And I’m really looking forward to picking up the projects I’ve been neglecting and making some real progress on them.  Hooray!  I don’t even feel like starting something new, because my old projects are almost like new ones by now.

I’m also thinking about giving in using Coppermine for my photo album software.  Yes, I’ve been using it for years on this site, so it seemed like a more sensible decision to keep using it and integrate it with WP rather than migrate to something else.  But there’s a good photo album plugin for WP, and the integration plugin for Coppermine doesn’t do precisely what I want it to do – it’s a great plugin, and it’s probably perfect for everyone else… but I’m picky!  Also, I do have to do some tweaking of the source code every time it updates because of the way I have my Coppermine set up, and… well, in the long run it might just be easier to change to using something more integrated with WP.  It’ll mean not having to theme Coppermine to match WP, too.  I’m going to ponder it a while more, but I expect I will change over.

Why am I mentioning this, when no-one but me cares?  Because it kind of fits the theme of the rest of this post: I’ve been hanging on to some things that I should have gracefully given in on a while back.  Letting go and making a few small changes will make things easier.  Note to self: change is good, and giving up on something doesn’t necessarily equate to failure.  There we go, that’s my deep personal insight for the day.  Now I shall stop rambling, let go of this post and send it into the big wide world (= hit the publish button)!  TTFN.

Project 365, 22nd March – 4th April

I meant to post these weekly, but I’ve gone and slipped up already.  So here are another two week’s worth of Project 365 photos.  They’re also up at Flickr in my Project 365 ’09-10 set and in the Project 365 album for this year in the photo album here (you can see the great-big full size versions there).  This time I’m going to put the medium-size pics up here rather than the thumbnails and put some comments in as well.  Ideally I want the medium pics to link to pop-ups of the full size versions, but the plugin I’m using to integrate the blog with the photo album is being a bit temperamental about that.  But with a bit of luck that’s what I’ll get.  Here we go:
Continue reading “Project 365, 22nd March – 4th April”

Conquering entrelac

Or so far… not.  Heeeeelp!  I’ve been going backwards and forwards on the first half-inch (the setup triangles) of the entrelac sock pattern that is the second pair for this year’s Sock Knitter’s Pentathlon.  I was getting great big gappy gaps between the triangles and after I looked at this tutorial / pattern [Ravlink] for an entrelac scarf that someone on the mailing list recommended, I came to the conclusion that it was because of the extra two rows at the top of the triangles in the sock pattern – they didn’t ‘attach’ to the sock cuff.  (The triangles were made by knitting increasing short rows, using one more stitch from the cuff every time until you get to six.  I don’t think I can describe it any better than that, but the scarf tutorial has pictures.)  The scarf tutorial, which starts the short rows with knitting one stitch instead of two like the sock pattern, solves that problem.  So that’s what I’ve now done with those.

[thumb:1122:l:l=d:t=]Pattern: buttercupia: Noro Entrelac Socks. [Ravlink]
Yarn: Posh Yarn Emily in ‘Troubadour’.
Needles: 2.75mm DPNs
Ravelry Project Page: SKP09 Pair #2

However!  Now that I’ve done all the triangles, I’m a bit stumped.  I have to pick up stitches to start the rectangle / diamond section, and it says to work left to right.  But I’m not sure if I’m sposed to turn the work before I do that, or go “backwards” on the right side, or what.  Aaaaaaah, confusing!  I think I’m just going to have to experiment and see what happens.  I should have knitted a swatch first.  Oh well!!

Other than the entrelac socks, I’ve been doing some spinning, actually remembering to keep up with taking Project 365 photos (I’ll post those soon), and… um… also doing other stuff?  Oh, I know – I have new glasses which is great because now I can see what I’m typing (always helpful), and I’ve also been reading a fair bit.  In fact, I’m thinking of doing Dewey’s Read-a-thon, although I should probably make my mind up soon if I am going to join in.  If I do, I don’t think I’ll commit to the whole 24 hours because I don’t want to mess my sleeping patterns up again just as they seem to be improving, but I could do 12 hours easily.  I would say more, but it starts at 1pm BST (the site says GMT, but they mean current UK time by that, not actual GMT) and that would make my finishing time too late.  And in fact, since it’s just past 1am right now, I think I’d better go to bed and get some kip!  Night.

Friday 5 for April 3: More Questions about Food and Drink

Here we go, my answers for this week’s Friday 5:

  1. What is your favourite fizzy, bubbly drink?
    Pepsi!  Or Coca-cola as a second – I don’t like the diet versions (unfortunately!), and I’m not keen on the non-branded ones either.  They just don’t taste the same.  Picky, picky me.
  2. What is your favourite deep-fried food?
    Um.  I don’t really eat deep fried food.  Oh, except for crisps I spose.  So, crisps?  And sometimes chips, but not if they’re too greasy.
  3. What is your favourite hot beverage?
    Hot lemon squash.  Weird, I know, but I don’t drink tea or coffee, and although I do like hot chocolate I only have it as the occasional cold-weather treat.  It’s too thick / sweet for a regular drink for me.
  4. What is your favourite really messy food?
    Depends what you call messy!  Spag bol, maybe?  Or maybe tortilla chips and dip because you’re bound to get dip on you at some point.
  5. What is your favourite recipe for a blended or mixed beverage?
    Not really sure what this means!  Like a cocktail?  Or a smoothie?  If we’re talking alcoholic beverages, I like Archers, vodka and orange juice.  If not, then banana smoothies are probably my favourite.  The recipe for that when I make my own is one banana (chopped up into smallish pieces), either (a) a scoop of vanilla ice cream, or (b) a tablespoon or so of natural yoghurt (depends what I have), and about half a pint of milk… or maybe more than that, I’m not sure!  I generally go by ‘feel’.  Then I whizz it all together with the whizzing device.  Add a bit more milk if need be to taste, whizz again, etc.  Serve with a sprinkle of cinnamon. Nom!

In other news, an actual knitting post should be coming soon!  I’ve just cast on for the second SKP09 pattern, which is a pair of entrelac socks.  There’s a new challenge right there – I’m just about to start the actual entrelac part and it’s all very exciting.  And nerve wracking!  Photos will be forthcoming… assuming I can make it all work.

A bit of a catch up

Oops again: I managed not to blog for yet another whole month, and missed my 8-year Blogoversary in the bargain (thanks for the ‘versary wishes!). So what have I been doing?

Well, I’ve done a couple of websites for my brother and another group in his year at uni, for one of their group projects (no, I wasn’t doing the work for them! They’re allowed to ’employ’ people for various jobs that they can’t cover themselves in the group). Gave me a chance to do something new-ish with embedding streaming video and audio, and play with some CSS3 as well. Hooray!

Talking of websites… I still haven’t got the redesign for this one sorted out. Really must buckle down and do that. I had to delete the (MT) search script for the blog because it was being hammered with spam and overloading the server… hopefully when I switch over to WP I won’t have that problem. However, I want to get the new design done before I change over (so I don’t have to faff around turning this one into a wp theme as well), especially since I’m going to be running the whole site apart from the photo album through it.

Other than that, I have got some knitting done: I finished Em’s mittens, and I’ve even managed to blitz through the rest of the WFS [RavLink], which is actually Mum’s birthday present… from last year. Ahem. But it’s done now! All except a bit of weaving in, and the all-important blocking, that is. I’m thinking I’m going to evict the cat from the bedroom tomorrow, clear off the bed, and use that for blocking it on. If it doesn’t get dry in time, I can always sleep on the sofabed for one night. I’ve actually been quite organised with my knitting so far this year: I still have several unfinished projects, but I’ve put most of them to one side and worked on just two or three… which has meant I’m finishing, or getting towards finishing things! My final pair of SKP08 socks, and the gloves I’ve had hanging around for ages with just one done are both well on their way. No pictures today, though. Site redesign first! Off I go again to work on that :-)

How many voices, now?

Huh, yeah… you remember how I was babbling about different voices. Or ranges / registers in your voice, I suppose. Well, my chest voice is now still about as much use as it was the other day, but my head voice has taken itself off as well. D’oh! I probably sound rather silly. However, I feel quite a lot better, so yaaaaay! I haven’t gone back to knitting anything because I don’t want to cough over it and make it all germified… although I spose if I do my Pentathlon sock it won’t matter since that’s only for me anyway and the needles should be perfectly washable.

Anyway, here’s what I did get done for Christmas:

Photo of M's Christmas fingerless mitts
Some fingerless mittens as a surprise for my brother, since their flat is really cold! He also thinks they’ll be good for when he’s on his bike. [RavLink]

And some rather less finished….
Photo of E's Christmas mittens in progress
… mittens for my sister-in-law-to-be (I have got to find a snappier way of phrasing that, but “brother’s financee” is almost as long to type!). I did actually finish this one, but I forgot to take a photo. D’oh. Anyway, I gave her that one as an “IOU”, and as soon as I’ve stopped being all yuck, I’ll get the other one done. At least I now do know that I had the sizing right! [RavLink]

I think they both liked them – I wasn’t quite sure what my brother would think about a (*gasp*) hand-made present, but he actually seemed pretty pleased :-)

Pentathlon sock #5

Since most of what I’m knitting right now is shhhhh, secret, here: have a photo of something I can show you! It’s my fifth and final pair for the sock knitters’ pentathlon. Currently on temporary hold while I finish the presents I have to do, but I should get it done by the end of the month with no problem.

Photo of Sock Pentathlon pair #5 in progress

Pattern: Summer Olympics Medals Socks 2008 by FrauHugs [Ravlink]
Yarn: Posh Yarn Lei in Drizzle
Needles: 2.5mm, 80cm circulars (Addi Turbo)
Ravelry Project Page: Pentathlon Pair #5

Project 365 #8, Days 52-67: 1st – 16th March

Stiiiiiiiill catching up: here are days 52 to 67 of my Project 365 photos – the first half of March. I’m going to post them in chunks of half a month at a time until I get caught up, now. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album. Or for the most up-to-date version, try my Flickr set.
On to the pics (click them for the full sized versions):

Continue reading “Project 365 #8, Days 52-67: 1st – 16th March”

Lesson Learned

Note to self: do not turn a sock heel late at night while watching telly and not counting properly. It will only end lopsidedly! Ah well, back I go!

This is, by the way, the third pair of socks for the Sock Knitters’ Pentathlon – the Rattlesnakes. I’m loving the twisty twiney cables, I really am. I’ll do a proper update soon and post a photo.

Part of the reason I’ve been so quiet recently, by the way, is that I’m not sure I’m getting on well with this version of Movable Type. Still, if I don’t use it I can’t get used to it enough to be sure. But the design templating system…hmm… I need to find out more about it. Because right now I’m getting more and more tempted to change the whole site to run off of WordPress (not just the blog). I think I can do that with MT as well, but I already know how WP works, so. I spose it all bears more looking into, and 1am isn’t the time to do it! I’m off to sleep on it again.

Alive, alive-oh

D’oh, I zoned out for a while there. I wish that would stop happening. My next psych appt isn’t until July, either. It was s’posed to be April or early May, but it got put back. :-/ Still, I can phone them if need be, so it’s not that bad.

Anyway, I haven’t been completely unproductive (read: asleep) over the last few weeks. I’ve been reading (I keep meaning to write reviews… I really will do that. Eventually), and knitting, which I shall talk about a bit more in a moment, and doing a bit of work on a fannish website project with Sann. And over the last couple of days I’ve been gradually putting some knitting / crochet books and some more yarn up for sale on eBay. I might even get the non-knitting things I have to clear out up there, if I can get around to taking photos and working out postage. I need a better pair of scales!

Actually, talking of scales, I may or may not have lost weight recently, but I have been eating more healthily. And without having to think about it too hard, either – it’s becoming more of a habit, which is really good. As well as that, I’m going to start doing more exercise again. I had meant to before, but I as part of the whole zoning out thing I was mainly stuck indoors. However, this morning I’m planning to either go for a walk in the park if I can get hold of Ally in time, or go to aquafit and then either the gym or just stay in the pool for a swim. I’ve got to get back into a routine where I’ve got something to get going for in the morning, and having something that I need to leave the house for is better. Otherwise I’m likely to faff around at the computer in my pyjamas until lunchtime! Quite possibly doing something productive, but still – I need that routine of being really “up and about”, and being actually dressed is part of that.

Back to the knitting, anyhow. Let’s see… looking back at those goals I set myself at the beginning of May, I’m afraid I still haven’t finished Mum’s present (I’m going to go and do some work on that in just a mo!). But as I said, I did finish the baby bootees, and I’ve also finished my second pair of socks – the Berlin Muster pattern – for the Sock Knitter’s Pentathlon. I hit my personal targets as well: I wanted to finish in the first 100, and to improve my sock knitting time. Which I did: I finished as number 68, on 23rd May, so it took me exactly 3 weeks to knit them, doing an average of an hour or two a day. :-) Since then, as well as Mum’s pressie I’ve been working on my Fireworks socks, and I’ve now finished the first one after a bit of a hiccup with the garter stitch toe the first go around (it ended up about twice as long as it should have been!). The second one of those is cast on and I’ll now be slowly making my way down the leg whenever I want to work on a project that requires very little concentration for the most part. I don’t have any pictures of that just yet, anyway, but I do have some of the finished objects. Want to see?….

Continue reading “Alive, alive-oh”

Project 365 #7, Days 45-51: 23rd – 29th Feb

Still catching up! Here’s the rest of February: days 45 to 51 of my Project 365 photos. If you want to see all the photos so far, click on the Project 365 category link, or check out the Project 365 folder in the photo album.
On to the pics (click them for the full sized versions):

Continue reading “Project 365 #7, Days 45-51: 23rd – 29th Feb”

Rebel rebel

My second pair of socks for the Pentathlon is underway. For this one, I think the main challenge is in the preparation (there was confusion over which translated version of the pattern and which chart was most accurate), and since it’s a 16 row lace pattern where the stitch count increases and decreases a couple of times, you have to keep your mind on what you’re doing. I’m not finding it too much of a problem though. Not mindless telly knitting, but fine for watching something where I don’t want to have my eyes glued to the screen the whole time and so can keep count.

However, I have rebelled a little ;-) The pattern recommends using solid or semi-solid colours, and I… have not. I was going to: I said in my last post that I was intending to use a solid red. But the lace pattern is a leafy sort of thing, and I just didn’t want to make it in red. It would probably look lovely in the Yarn Yard September Club yarn:

Photo of the Yarn Yard September Club Yarn

…. but much as I think that yarn is beautiful, if I make yet another pair of green socks right now I might lose the will to live. ;-) So that one was out.

Then I thought, well, it’s a really pretty pattern. (In fact, if ever a pattern said “knit me in pastel pink!” to me, it’s this pattern, but that’s never going to happen. Sorry pink, but I’ll never wear you. Ever.) It’s lace, but I’m not sure that a multi yarn would obscure the pattern completely. And the Yarn Yard Feb 08 ‘Art Deco’ club yarn is really really pretty: light blue, chocolate powder brown, cream, pale yellow, a hint of soft green. Really springlike. And I could use the minty blue-green contrast skein for the cuff, toes, and maybe the heels. So, that’s what I’ve cast on with. And I was right, this yarn is really pretty. However, so far I’m not entirely sure if it’s knitting up as a pretty lacy sock, or a small woolly pizza. Below is a photo of the cuff and first lace repeat. Any thoughts, anybody:

Photo of my Pentathlon pair #2, cuff and first lace repeat

Anyway, here are the project stats as they stand at the moment:
Pattern: Berlin Muster by Kristin Benecken [Ravlink]
Yarn: The Yarn Yard Bonny (previously Sock) in Art Deco (Feburary 08 Sock Club yarn)
Needles: 2.5mm DPNs
Ravelry Project Page: Pentathlon Pair #2

If I do decide to change the yarn, I’ll definitely stay with Yarn Yard Bonny as it’s just perfect for the project, and I think I’d either go for the solid bright blue from the November club yarn or persuade myself that three pairs of green socks in five months would be fine, and use the above August one. I’m hoping that the Art Deco will work out alright, though. Not least because I’ve set myself the goal of coming in within the first 100 this time…

Progress from last week.

Last week, I bribed myself by setting a list of goals to achieve before I could have my “carrot” of casting on a lovely new pair of socks. Sooooooo, how did I do?

  • Finish unpicking the cast off of the second Jacobean sock and re-do it with a tubular bind-off (first sock already successfully done, yay);
    — Done! And oh, I love them. They’re scrummy and squishy and now fit perfectly. LOVE!
  • Finish one repeat of the WFS edging;
    — I now have several repeats done, which is sort of good. But not ideal, since I passed my deadline for finishing the thing. D’oh! I’m still plugging away and enjoying it, though.
  • Do the finishing for the two pairs of baby bootees (which honestly isn’t going to take long! I’ve just been procrastinating), which means: seam up the flat knit pair, make knitted buttons for both and attach them, make the button loops, sew in any ends;
    — DONE. Why do I make such drama in my own mind over things that really aren’t that terrible (such as sewing up one tiny bootee)? Dear self: stop it!! I’ll make another post soon with some pictures.
  • Stop mentally flailing over which yarn I should use for the next Pentathlon project because really, I can’t choose properly until I see what the pattern is (although I’m sure I will be posting a short list of my possible choices here like I did last time);
    — I’ve pretty much managed this. In fact, I’m not even going to post a short list. I think I’m going to use some YY sock in bright red “Shelter”, since the guidelines say that a solid or semi-solid is best, and light – medium and/or bright colours are suggested. Plus, I already have that one wound into a yarn cake ;-) I’ll make my final decision when the pattern comes online late tonight.

And my prize? Wheeee, I’ve cast on for the lovely Bracket Fungus socks. My version are the Bracket Fungoths, because I’m using YY Hot Pink Goth yarn as the multi colour and I never can resist a good (bad) pun. As I promised myself, I’ve only done the cuff so far because the WFS has to take priority for now, but here’s how it’s looking so far:

Cuff of my Bracket Fungus socks

Yay!